St Barts
Return to projectsSt Barts
Client: Deconstruct
Value: £confidential
L+C have designed the temporary works for the St Bart's Hospital Old Pathology Building project comprising a load-bearing facade retention system on two elevations, installation of a temporary propping system and sacrificial thrusts block at basement level to allow the demolition of existing ground and basement slabs and construction of a deeper basement. The existing building comprised a lower ground floor with five storeys above, and a load-bearing masonry structure with Portland stone facing facade.
L+C also developed a detailed construction sequence and produced 3D Revit models for different phases of the project.